The building is late. Or stopped. And you have been paying.

Delay and abandonment of developments are ordinary litigation in Brazil, which means the ground is well trodden: there are established routes for delay compensation, for suspending payments and for recovering what you paid. Which route fits depends on the contract and on how far the works got.

Review of the contract, the works and the options · Reply within 1 business day

Brazilian law firm · OAB/RJ 113.775American Bar Association — the main U.S. lawyers’ association · international member (Affiliated Professional) · a Brazilian lawyer We answer in your time zone Everything by power of attorney — no need to fly We read the registry before you sign

What your options actually are

Compensation for the delayOnce the grace period has passed, delay generally entitles the buyer to something. How much depends on the contract and on the position the courts take.
Where the delay remedies come fromArticle 43-A of Law 4,591 of 1964, inserted by Law 13,786 of 2018. A tolerance of up to 180 days past the contractual date carries no penalty where it was agreed clearly and prominently. Beyond it, paragraph 1 lets the buyer who did not cause the delay terminate and recover everything paid plus the contractual penalty, within sixty days of termination. Paragraph 2 is for the buyer who keeps the unit: 1% of the amount actually paid for each month of delay, pro rata die. Paragraph 3 forbids cumulating the two.
Suspending or reducing paymentsPossible in circumstances, and dangerous if done unilaterally without advice. Stopping payment on your own can put you in default instead of them.
Terminating and recoveringThere is a regime for this, and the refund is not full where the buyer withdraws. Where the developer is the one in default, the calculation is different.
Forcing deliverySometimes the buyer wants the unit rather than the money, and that can be pursued.
Acting with other buyersDevelopments produce many buyers in the same position, and acting together changes both cost and leverage.
Whether there is anything to recover fromA developer with ring-fenced assets, or with assets at all, is a different case from one with neither. Worth establishing before litigating.

The worst move is the instinctive one

A buyer who sees the works stop and stops paying feels justified and has usually just made the case harder. Unless payment is suspended on a proper basis, the developer can treat the buyer as the defaulting party, which inverts the dispute.

The order that works is: read the contract, establish the stage of the works and the developer’s position, then decide between compensation, termination and forcing delivery, and only then change anything about the payments. That sequence is what keeps the leverage where it belongs.

What the first review answers.

Whether the delay is actionable yetAgainst the grace period in your contract.
What you would be entitled toCompensation, termination, or delivery.
Whether you can safely stop payingAnd on what basis, if so.
What the developer’s position isAssets, litigation, other buyers.
Whether there is anything to collectWhich decides if litigation is worth it.
What it would cost and how longIn writing, with court costs separated.
Luís Flávio Marques Lima, Brazilian lawyer (OAB/RJ)

Luís Flávio Marques Lima

Lawyer admitted in Brazil · OAB/RJ 113.775 · ABA Affiliated Professional member

A Brazilian lawyer acting for foreign buyers of Brazilian property — where the seller is here, the buyer is not, and the registry is the only thing that tells the truth about the asset. Over 25 years of practice, in English and Portuguese.

25+ years in practice Property, registry and succession Support in your time zone English and Portuguese

Tell us what has happened.

Our assistant takes it from here: a few questions about the estate, then a time with the lawyer if it makes sense.

Questions when a development fails.

Can I just stop paying?Not safely, and not unilaterally. Doing so can put you in default and hand the developer the stronger position.
Will I get everything back?Where you withdraw, no: the regime provides for retention. Where the developer is in default, the calculation is different and better for you.
Do I have to come to Brazil to sue?No. Litigation runs by power of attorney and the Brazilian courts work largely on the electronic record.
How long does this take?Longer than anybody wants. We give a realistic range and separate the stages, rather than quoting a total that means nothing.
Other buyers are organising a group.Frequently the best option, on cost and on leverage. Worth assessing before joining rather than after.
The developer is offering a settlement.Then the question is whether it reflects what you would get otherwise. That is calculable before you accept.
Buying off-planThe checks that prevent this.
The contractWhich decides most of your position.
Litigating from abroadHow a case runs with you in another country.
Recovering moneyWhen the dispute is about getting paid back.
Buying property in BrazilThe whole transaction, overview.

Further reading

Buying off-planThe registration and ring-fencing that decide the outcome.

Marques Lima Advogados is a Brazilian law firm advising on Brazilian law. This page is informational, does not constitute legal advice and does not replace individual analysis of the transaction. Registry practice, transfer tax rates and registration costs are set by each municipality and state and change over time — confirm the figures and the requirements applicable to your purchase before committing to anything.